Between a custom structural steel addition and a pre-engineered metal building (P.E.M.B.) addition, we added ~28,000 square feet of manufacturing space to this Burlington, WA manufacturing plant, much needed space! Here are the final pictures from the exterior. The interior is packed with proprietary manufacturing equipment and a integral crane on the structural steel portion.
Project Categories
Commercial
Share This Project